Solutions · Developers & builders
Phase the campus to the power you will actually get.
For teams taking a site from land and interconnect to energized halls. Aidni turns a staged utility schedule into a buildable, phased compute plan and a cooling design you can defend in permitting.
Who we work with
VP Development · Head of Design · Construction Director
The problems these teams bring to us:

- 01Interconnection arrives in tranches years apart
- 02Cooling and water design questioned in permitting
- 03Design changes late in construction as rack densities rise
How Aidni helps
The systems that do the work.
PlanA-101
Aidni Grid
Phase-by-phase power envelope and rack plan tied to the interconnect schedule.
Open systemBuildA-102
Aidni Thermal
Cooling architecture comparison and water model for the permitting package.
Open systemProveA-104
Aidni Ledger
Community and utility fact sheets built from the same model.
Open systemOutcomes
What you get.
- Energized MW and GPUs per phase, with dates
- A defensible water and energy design basis
- Fewer late redesigns as densities change
Every engagement starts with a fixed-fee Site Assessment, so you see the model of your own facility before committing to a subscription.
Start here
Bring us one site. We will show you its real capacity.
A six-week Site Assessment maps the power envelope, the cooling design and the compute plan for one facility, delivered by the engineers who build the platform.